Combined Use of Rollers in Asphalt Pavement Construction

2026-03-14

I. Roller Combination Principle

Asphalt pavement construction needs multiple machines working together.Common combination: Tandem-drum roller + Pneumatic tired rollerSingle-drum roller is not used for asphalt surface.

II. Three-stage Rolling Process

  1. Initial rolling – stabilization

    • Equipment: Tandem-drum vibratory roller (static or light vibration)

    • Function: Stabilize mixture, prevent shoving and cracking

    • Key: Follow paver closely, high temperature, slow speed

  2. Intermediate rolling – densification

    • Equipment: Tandem-drum vibratory roller (high frequency, low amplitude)

    • Function: Reach designed density

    • Key: Main compaction stage, most passes

  3. Final rolling – finishing

    • Equipment: Pneumatic tired roller or tandem-drum static

    • Function: Remove wheel marks, improve smoothness, seal surface

    • Key: No vibration, last pass

III. Standard Combination

  • Conventional asphalt pavement:Initial: Tandem-drum static / light vibrationIntermediate: Tandem-drum vibrationFinal: Pneumatic tired roller

  • Bridge deck / thin asphalt:Mainly use tandem-drum roller, little or no pneumatic tired roller.

IV. Key Points

  • Initial rolling stabilizes, intermediate rolling densifies, final rolling finishes.

  • Tandem-drum: compaction

  • Pneumatic tired roller: smoothness, kneading, finishing

  • Sequence: edge first, middle later; light first, heavy later; slow first, fast later.

  • No sudden brake, turning or stopping on hot asphalt.

V. One-sentence exam template

Use tandem-drum + pneumatic tired roller in combination.Initial rolling: tandem-drum for stabilization.Intermediate rolling: tandem-drum vibration for density.Final rolling: pneumatic tired roller for smooth finishing.

英文官网图片水印模版.jpg

Online Message